The Etihad Rail project has been conducted in two stages, with Pandrol selected to provide our Under Ballast Mat (UBM) and Embedded Track Solution (QTrack®) for both. Stage One was completed in 2016, where around 250km of ballasted track was used to connect two large gasfields in Shah and Habshan to an export terminal in Rewais in the western region. Stage Two has consisted of six packages across UAE including a connection to the Saudi border, with more than 600km of additional track.
With a wide range of stiffness available, UBM was selected to address different customer problems such as track quality improvement, track protection, and vibration attenuation. Despite demanding specifications, our team of Pandrol engineers were able to analyse customer needs to design the highest performing solution for vibration attenuation – an issue which remains one of the most demanding challenges faced by railway infrastructure today.
For the embedded track solution, Pandrol supplied a tailor-made design according to the rail profile and rail inclination. The system needed to be durable against the extremely high temperatures of UAE and so the profile was designed to prevent buckling. Pandrol QTrack® as embedded rail technology can be simply casted-in-situ during the concreting phase.
Throughout the entire process, strong relationships were key. This was especially important at the beginning of the project when we were acting during a time with limited standards. Pandrol maintained close interactions with the customer and consulting engineers to cover the necessary documentation.