As with the initial trials & under normal circumstances, a member of Pandrol’s specialist training team would always travel to the work site to carry out inperson training on the installation of the fasteners with the sleepers. However, border closures and travel restrictions associated with COVID-19 made this impossible, with the first big installation, so Pandrol adapted its training to an online format. The training covered how to install a fastener to a sleeper, how to build a track, plus how to inspect and maintain the track once installed.
Pandrol’s team also advised on suitable equipment for installation. The Rosenqvist Clip Driver CD200 IQ was selected for installation of the track.
The second stage of the project, which started in 2019 was to connect the Sainshand-Baruun-Urt-Khuut railway with the Tavantolgoi-Zunbayan, Khuut-Bichigt, and Khuut-Choibalsan rail lines.
The total length of the track in this phase was over 400 km and it was constructed using pre-assembled sleeper panels with integrated rail fasteners, with the second half of the track being built using loose sleeper laying techniques by MTL the local private contracting & engineering company.
The Sainshand-Baruun-Urt-Khuot railway line will transport up to 12 million tons of coal annually once the extensions & connections have been completed.
A further phase of this huge project is the Zuunbayan – Hangi Mandal line where Fastclip FE fasteners for the 180km stretch of track has been completed by MTL using Rosenqvist Clip Drivers CD200 IQ.
A significant challenge on this project was dealing with the extreme conditions in the Gobi desert, which is known for its extreme climate and rapid temperature changes throughout the year, the conditions are exacerbated by the incessant wind & sand storms caused by the Siberian anticyclone.
It was therefore extremely important that work on site could be completed quickly and efficiently with installation of the sleepers being a prime constituent, the use of mechanical help from the Rosenqvist machines made a significant difference in speeding up the installation of the track.