Rail Fastenings Systems

Safelok III

Safelok III builds upon its predecessors by meeting the need for fast, efficient track installation and reduced maintenance.

Safelok III product overview

All components are captive on the tie when delivered to site.

  • The system exceeds the standards and requirements established by the world’s major railroads and provides optimal performance over a wide range of operating conditions

Benefits of Safelok III

01

Reduced manpower

Safelok III is pre-assembled and captive to the tie, meaning there is a significant reduction in the manpower required during rail installation and adjustment

02

Reduces potential damage

Low profile shoulder is less likely to be damaged

03

Reduced cost

The dual-insulator design results in extended component life and significantly reduces maintenance costs

04

Components remain on track

All components remain on the track during rail changeout or de-stressing

05

Enhanced gage retention

Exceptional gage retention and outstanding durability

Technical features of Safelok III

01

Efficient

Fast, fully mechanised application and removal with existing track equipment

02

Positive clip retention

Mechanical lock-in feature provides positive clip retention

03

Optimal performance

Meets or exceeds the standards and requirements established by the world’s major railroads and provides optimal performance over a wide range of operating conditions

04

No metal-to-metal contact

No metal-to-metal contact at the clip/rail interface

Tell us about your project